Brokeloher Str. 8, 31628 Landesbergen

Get a consultation
Mon-Fri: 09:00 - 18:00
  • This type of construction involves the assembly of houses with ready-made walls. The walls already contain windows, shutters, engineering channels, plasterboard, and external insulation of the facade.
  • Assembled structures meet construction criteria such as static parameters, fire safety parameters, and sound and thermal insulation properties at the KfW40 level.
  • The roof is also installed in the form of ready-made thermal insulation panels.
  • The entire house assembly can be completed in 3-4 days (see assembly video). Construction of a turnkey house in 2-3 months.
  • The assembly and preparation of walls are carried out exclusively in controlled factory conditions at our production facility. High precision of structures significantly reduces the number of errors that may occur on-site.
  • For the contractor, this ensures a high construction speed and thus savings in time and costs for project management.
  • This technology allows building houses at any time during the year.

Fill in the form. We will assess the workload and give you the full cost and terms:

    Fill in the form. We will assess the workload and give you the full cost and terms: