Building a house using Canadian technology does not require significant time or financial costs. The foundation will be ready in the shortest possible time. The pouring of the strip foundation by the specialists of our company is carried out fast and at a high level.
We offer only really effective solutions aimed at achieving maximum durability, reliability, and structural strength of the house. We will perform the necessary calculations immediately, and we will choose the best option for your project. You can build a house from SIP panels in minimum terms.
Construction of a strip-column foundation with a screed
The construction of a turnkey house should be adapted to the climatic, geological features of a particular location. A strip-column foundation with a screed is the best solution for soils with pronounced frost deformation characteristics. The point is that the forces pushing the base out of the soil affect small parts of the structure. As a result, shrinkage deformations are minimal, compared to the same monolithic strip.
Among the advantages of the cement-concrete foundation are an affordable price, the minimum amount of work, the possibility of realization of the project completely on its own, short construction terms. But you can’t build a basement with a foundation. It is not recommended to build buildings with heavy materials on a columnar basis, houses more than one floor. Also, the technology does not apply to peat, water-saturated, clay, soft soils, and areas with complex topography formations.
A strip-column foundation with the fastening is arranged in several stages:
- Preparation of the worksite. It needs to be cleaned, the ground levelled, ground marked.
- Drilling of wells for future supports. Manual drilling and additional equipment are used for the works. The well at the bottom is being expanded.
- Waterproofing of all individual wells. To ensure 100% safety of the supports, reliable protection of the pillars is needed – they have to experience constant pressure from soil water. Roofing felt sheets or any other hydrophobic material shall be installed to prevent the base from breaking.
- Filling the bottom with a mixture of gravel and sand. The fittings are fixed in a vertical direction, usually, a set of 4 bars is sufficient.
- Installation of formwork – support body.
A strip-column foundation with a cold screed is quite simple to arrange, effective during operation. The main thing is to work according to all the rules and use high-quality raw materials.
The cost of pouring a strip-column foundation
We offer you to buy a house kit at the best price in Kyiv. «SIP ATLAS» is a modern European enterprise for the manufacture of energy-saving, ecological houses in Europe. We are constructing energy-efficient, ecologically clean turnkey houses, and our main task is to meet the needs of our clients in the building. State-of-the-art technologies and proven materials are applied.